Project objective
The treatment need and stage of the project.
Practical process & system planning
Process design, equipment selection & air treatment
Turn your facility requirements into a defined treatment approach, usable project documents and informed equipment decisions. Air Treatment Plant (ATP) services are also available.

Our service scope
Plan around water quality, capacity, available space and operating requirements. The document set and level of detail are agreed for your project stage.
Find the Right Starting PointDiscuss an Air Treatment Plant (ATP) for your facility. Share the air source, process, available measurements and treatment objective to define the appropriate plant and engineering scope.
Connect the treatment objective, available water information and required flow with a practical process approach. Clarify the design assumptions and interfaces within the agreed scope.
Develop the agreed layout and drawing information around the site and selected system. Define which drawings are included and how they support the project stage.
Organize the equipment and material quantities covered by the engineering scope. Connect the schedule with the agreed drawings and specification assumptions.
Review equipment requirements against the process, flow, water quality and operating conditions. Clarify relevant specifications and selection considerations for the project.
A clear project approach
The information and work are connected around your project scope.
Discuss the project stage, treatment objective and available site information.
Clarify capacity, quality targets, assumptions and scope boundaries.
Prepare the drawings, quantities or equipment guidance covered by the scope.
Explain the deliverables and address agreed technical questions.
Getting started
These details help us understand the requirement and discuss the appropriate scope.
The treatment need and stage of the project.
Available reports, flow and required output quality.
Available plans, space and utility information.
Drawings, quantities or equipment decisions you need.
Industry pathways
Helpful answers
Understand the selection and project scope before taking the next step.
The proposal defines the agreed process design, drawing set, bill of quantities or equipment-selection work. Share your project stage and required decisions so the appropriate document scope can be discussed.
Consultancy, equipment supply, installation and commissioning are different responsibilities. Their inclusion is clarified in the project scope; engineering documents alone should not be assumed to include all delivery work.
Share the available layout, system information and proposed change. These records help define a suitable review or design scope around the existing installation.
A bill of quantities organizes the specified equipment and materials. Pricing, site work, responsibilities and commercial terms need to be confirmed in a separate quotation or proposal.
Your next step
Share your facility, requirements and the decision you need to make.